Remodeling & complex repair project 3

  1. Fluorescent light fixture removed.
  2. Recessed cavity framed.
  3. New recessed light locations planned and cut.
  4. Crown molding installed, holes filled, gaps caulked.
  5. Install 2 Romex runs, install rope lighting above crown, install recessed lighting.
  6. Install extension junction box to accommodate additional dimmer switches.
  7. All affected drywall taped, floated 3 times, textured to blend with surrounding.
  8. Prime and paint kitchen.